Monday, 21 March 2016

A good bondage experience


We had another interrupted night. The wires get stuck in the bedlinen and Master is often too groggy and impatient to free himself, so I have to get up and do it. Master suggested I move my cot into the bedroom and move out of the cage. We went to the building site again today, Master wants to make sure they do not slack. It is a tight schedule.
They have to replace some beams, some were rotten and deteriorated while the building was empty. That's why the toolbox fell through the ceiling. Of course while they wait for the beams they cannot work in that area, but there is enough to get on with. Some other problems had to be discussed and I understood it better than Master did. I never did much in SR, just hand Robert tools, nails or wood. But something must have gotten stuck.
I moved a few more boxes. We had some time in the playroom this afternoon. It takes a bit longer, but Master managed to strap me onto the bench. Then he sat in the corner behind my head and talked to me. Oh, it was special!

No comments:

Post a Comment